Alerts Sign in
Advertise with Namibia News Now
Back
general

N$64m Okakarara VTC dispute heads to mediation

Staff Writer  A multimillion-dollar dispute over the stalled upgrading of the Okakarara Vocational Training Centre (VTC) has moved closer to possible settlement. This came after the High Court was asked to refer the matter to court-connected mediation before proceeding to trial. The dispute involves the Central Procurement Board of Namibia (CPBN), Octagon Construction (Pty) Ltd […]

Windhoek Observer8 Jul 2026, 05:18 am
N$64m Okakarara VTC dispute heads to mediation

Staff Writer

A multimillion-dollar dispute over the stalled upgrading of the Okakarara Vocational Training Centre (VTC) has moved closer to possible settlement.

Advertise with Namibia News Now

This came after the High Court was asked to refer the matter to court-connected mediation before proceeding to trial.

The dispute involves the Central Procurement Board of Namibia (CPBN), Octagon Construction (Pty) Ltd and the Namibia Training Authority (NTA) over a N$64.2 million construction contract awarded for the upgrading of the Okakarara VTC in the Otjozondjupa Region.

The parties requested that the matter be referred to mediation, noting that the NTA had not yet been joined when the case was previously considered for court-connected mediation.

Advertise with Namibia News Now
Originally published by Windhoek Observer on 8 Jul 2026, 05:18 am. View original article
Advertise with Namibia News Now